MY KOLKATA EDUGRAPH
ADVERTISEMENT
regular-article-logo Saturday, 23 November 2024

Operations begin at Rs 700-crore new terminal of Port Blair airport with IndiGo flight from Chennai

A special programme was organised to mark the commencement which included tribal dance forms and welcoming flyers with flower bouquets, traditional 'aarti and tilak'

PTI Port Blair Published 21.08.23, 01:12 PM
The new integrated terminal building at the Veer Savarkar International Airport, Port Blair

The new integrated terminal building at the Veer Savarkar International Airport, Port Blair PTI

Operations at the new terminal building of the Port Blair airport began on Monday morning, officials said.

The operations began with the arrival of an IndiGo flight from Chennai. The flight, 6E-6213, landed at the Veer Savarkar International Airport with 83 passengers at 7.10 am, they said.

ADVERTISEMENT

The second plane which arrived here was of Air India. The flight, AI-549, landed at 7.20 am with 84 passengers from Chennai, they added.

PTI

The IndiGo plane was also the first one to depart from Port Blair, at 7.35 am with 159 passengers for Chennai. The Air India flight also returned to Chennai with 161 passengers.

A special programme was organised at the new terminal to mark the commencement of operations. Besides tribal dance forms, the flyers were welcomed with flower bouquets and traditional 'aarti and tilak' on the first day.

Nicobari traditional hats made of palm fronds were also gifted to them.

Prime Minister Narendra Modi virtually inaugurated the new integrated terminal building of the airport in the capital city of the Andaman and Nicobar Islands on July 18.

PTI

The new terminal, which is shaped like a shell depicting the natural environs of the islands, has been built at a cost of Rs 707.73 crore.

The terminal, which has a total built-up area of 40,837 sq metres, has 100 per cent natural lighting. It has a capacity to handle 1,200 passengers during peak hours, and around 40 lakh passengers annually.

The three-storey building is equipped with 28 check-in counters, 12 immigration counters, three passenger boarding bridges and four conveyor belts. The new apron at the airport has the facility to park 10 aircraft.

Except for the headline, this story has not been edited by The Telegraph Online staff and has been published from a syndicated feed.

Follow us on:
ADVERTISEMENT
ADVERTISEMENT